
AI Solutions
An AI solution uses artificial intelligence to perform tasks like content creation, translation, or analysis - automating manual work, increasing accuracy, and speeding up complex workflows.


Smart from the start
AI in localisation isn’t just about speed. It’s about smarter workflows, better content, and scalable accuracy.
At LanguageWire, AI tools are fully embedded into the ecosystem, not layered on top.
Each one is designed to automate complex processes, personalise outputs using your linguistic assets, and keep multilingual content moving—securely and efficiently.

How AI is wired in
AI solutions at LanguageWire are built to automate the complex, personalise every output, and keep multilingual content flowing - securely and at scale.
From machine translation and voice synthesis to content generation and quality estimation, each tool is designed to reduce manual effort, improve consistency, and accelerate delivery.
Whether it’s generating first drafts, translating at scale, reviewing output, or producing multilingual voiceovers, LanguageWire AI tools are fully integrated to optimise the entire localisation lifecycle.
Explore LanguageWire’s AI Toolkit
AI-powered workflows and routing in one secure system - connecting tools, teams, and automation at scale.
AI creates brand-consistent content using your approved tone and terminology; ready for localisation from the start.
High-speed, AI-trained translation with quality estimation tailored to your brand and ready for expert post-editing.
Translate instantly in-browser. AI applies your terminology for fast, consistent results across teams and markets.
AI-enhanced editing with built-in QA, machine translation, and live previews - cutting rework and boosting accuracy.
AI-generated voiceovers with smart syncing and brand-tuned pronunciation, perfect for scaling multilingual video.

LanguageWire TMS
The foundation of all localisation operations. AI helps route jobs, apply quality checks, select providers, and continuously learn from your content - all in one secure, scalable environment .
-
Automate routine tasks across projects and teams
-
Use smart routing, validation, and workflow orchestration
-
Monitor quality in real time with built-in feedback loops

LanguageWire Generate
Generate multilingual copy using your approved tone, terminology, and past content - so every draft is accurate from the start.
-
No blank page: AI builds on what you've already approved
-
Choose tone, length, and format—no prompt writing required
-
Built for localisation and connected to your TMS

LanguageWire MT
Fast, secure machine translation powered by AI and tailored to your brand. Uses your termbases and translation memory for consistent output plus quality estimation to focus human review where it matters most.
-
Trained on your brand language
-
Quality-scored segments for smarter editing
-
Runs on LanguageWire’s secure, proprietary MT engine

LanguageWire Translate
A self-service tool for translating short texts, documents, or websites. Fast, secure, and on-brand.
AI applies your preferred terminology automatically, with support for multiple languages and file types.
-
Translate into multiple languages at once
-
Works with DOCX, PDFs, HTML, and more
-
Edge plugin and SSO access included

Smart Editor
AI-powered workspace for review and refinement. Combine tailored machine translation with built-in quality checks, terminology support, and in-context previews to ensure accurate, on-brand content—every time.
-
Spot errors early with 20+ automated QA checks
-
Collaborate with linguists and reviewers in real time
-
Improve quality continuously with AI-assisted editing

AI Dubbing
Turn video scripts into lifelike, multilingual audio using AI-powered voice cloning and pronunciation editing.
-
Fine-tune brand terms and product names automatically
-
Keep voice, tone, and flow consistent across markets
-
Sync audio to scenes, emotion, and context
Built to support every team and industry
Translate regulated content with AI-powered MT and Smart Editor to improve accuracy, reduce manual review, and stay compliant.
Accelerate localisation of technical documentation, training, and safety materials - while keeping terminology precise and reusable.
Speed up UI localisation, support content, and release notes using AI-enhanced workflows without adding complexity.
Generate on-brand copy, translate campaigns instantly, and validate creative content - all with AI that learns your voice.
"We started working with LanguageWire for straight-forward translations. Today we lean on them for creative copywriting and movie scripts while still receiving timely and to-the-point translations. I couldn't be happier with their services."
Enterprise-grade security for your sensitive information
We secure your data with verified systems, constant monitoring, and tested resilience.

Ready for the next step?
Combine AI tools with expert validation to ensure high-impact, high-accuracy content.
Explore how Editing & Validation solutions refine AI output with human-in-the-loop quality control.
Learn what worked
We’re lucky to work with a range of globally ambitious brands.
Let’s build an AI-driven localisation strategy—your way
Whether you're scaling content, simplifying workflows, or preparing for multilingual rollout, AI tools from LanguageWire give you the flexibility to move faster, stay consistent, and keep costs down. Talk to an expert